Meet Inspiring Speakers and Experts at our 3000+ Global Conference Series Events with over 1000+ Conferences, 1000+ Symposiums
and 1000+ Workshops on Medical, Pharma, Engineering, Science, Technology and Business.

Explore and learn more about Conference Series : World’s leading Event Organizer

Back

Andreas Engelbrecht

Andreas Engelbrecht

University of Pretoria, South Africa

Title: An audit of the management of tricyclic antidepressant overdose in the Emergency Unit of Steve Biko Academic Hospital, Pretoria, South-Africa from 2009 to 2012.

Biography

Biography: Andreas Engelbrecht

Abstract

Background: Tricyclic antidepressants (TCA) are frequently used in South-Africa due to their availability and low costs. These drugs are highly toxic in overdose. The aim of the study was to audit key aspects in the management of patients with TCA overdose against an international benchmark.\r\nMethods: A cross sectional descriptive audit of clinical records was done. The findings were measured against the Guidelines for medical therapy of the Emergency network (GEM net).\r\nResults: Thirty-two clinical records were recruited and audited. The following findings were made:\r\nThe vital signs of 30 (93, 7%) patient’s were recorded, 21(70%) were abnormal. One case with hypotension was not managed appropriately. Eighteen (56%) patients had their blood pH analyzed. Six were abnormal. None of these were managed appropriately. Thirty (93, 7%) EKG assessments were done. Only 17(56.6%) were recorded. Five (29%) printouts could be found within the files. Of these 4(80%) had an abnormal tracing but had not been treated. Of those EKGs only documented, 3(25%) were described as abnormal but were managed inappropriately. Treatment with Bicarbonate was either omitted or done inappropriately and without monitoring. The Level of consciousness of 31 (96%) patients was recorded. Three who required intubation were not intubated.\r\nConclusion:\r\nThe management of TCA overdose did not meet the standards prescribed by GEM net in our sample. This Audit had a number of limitations but was used to improve the management of this condition in our Unit and may be useful to others.